Manufacture, transport and assembly of 8 stainless steel storage tanks for a pulp mill, with capacities of up to 500 m³ and one key challenge: solving the assembly and the lifting on a site with very little space

Client requirements
The client needed to add 8 process storage tanks at a pulp mill, with different capacities, materials and dimensions. The equipment had to be built in AISI 304L and 316L stainless steel, with capacities between 25 m³ and 500 m³, diameters from 2,500 mm to 10,000 mm and a design pressure of 50 / -5 mbar. The main difficulty was the limited space, which ruled out conventional vertical assembly inside the plant.

Our solution
We planned phased manufacturing, with partial prefabrication, outdoor assembly and a critical lift to the final location.
- Manufacture of 8 tanks in AISI 304L and 316L stainless steel to the applicable structural standards.
- Capacities between 25 m³ and 500 m³, with diameters from 2,500 mm to 10,000 mm and a pressure of 50 / -5 mbar.
- Partial prefabrication and outdoor assembly to get around the lack of space available in the plant.
- Critical lift with high-capacity cranes to the final position, protecting structural integrity.

Media gallery
Gallery of the critical assembly: prefabrication, lifting and final positioning of the tanks on site.

Facing a similar challenge?
If your project calls for building, protecting, transporting or assembling equipment far from where it was made, we will help you resolve it with experience, coordination and technical judgement.